Network Station Response Form Joint CSTG/IERS Call for Participation International VLBI Service for Geodesy and Astrometry Network Station name: Gilmore Creek Geophysical Observatory Parent/Funding organization: NEOS, a joint effort of the U.S. Naval Observatory and the NASA Goddard Space Flight Center for VLBI Name and title of onsite technical contact: Rich Strand, VLBI OPS Leader E Shift Steve Caskey, VLBI OPS Leader F shift Name and title of administrative contact: W. T. Wildes, GSFC VLBI Network Manager Station mailing address: GCGO/VLBI, 1300 Eisele Road, Fairbanks, AK 99712 Onsite phone: +1-907-452-9146 Onsite fax: +1-907-451-1288 Onsite e-mail address: steese@icefog.gcgo.nasa.gov Web access onsite? Yes_x_ No__ Internet access onsite? Yes_x_No__ Internet connection type or bit rate: 56k Check the collocated space geodetic techniques at your site: SLR___GPS_x__DORIS_x__PRARE___ GLONASS___Gravimeter___ Other (specify): Indicate the observing networks and programs in which your station regularly participates: NEOS_x__ EUROPE___ CORE-A_x__ CORE-B_x__ RDV_x__ IRIS-S_x__ Other (list): Percentage of time your station is used for geodesy/astrometry _100__ List other observing time allocations and percentages of each: Indicate the configuration(s) you use for data acquisition (check all that apply): Rack: Mark IIIA__ VLBA__ VLBA-G_x_ Mark IV__ VLBA4__ K4__ S2__ LBA__ Other (list): Recorder: Mark IIIA__ VLBA_x_ Mark IV__ S2__ P&G(VLBA)__ VLBA4__ K4 (specify type)__ Other (list): FS Version: 9.3.23 PC model: SWT P233 Other control software/computer H-maser model: NR-5 Other frequency standards: Rubidium GPS timing receiver model: TAC X/S receiver RF bandwidths: 2210-2450 MHz, 8180-8980 MHz Number of full-time-equivalent personnel assigned to station functions: 2 Describe any hardware/software/equipment upgrades that are planned for your station. Upgrade to VLBA4 is planned for ~2001. K4 to be installed by CRL. New electric drive telescope possible. Attach a list of personnel (names and titles) whom you designate as IVS Associate Members through their affiliation with your station. William T. Wildes, GSFC VLBI Network Manager, wtw@wildbill.gsfc.nasa.gov Rich Strand, VLBI OPS Leader E Shift, steese@icefog.gcgo.nasa.gov Steve Caskey, VLBI OPS Leader F shift, steese@icefog.gcgo.nasa.gov Ed Himwich, Scientist, NVI, Inc./GSFC, weh@vega.gsfc.nasa.gov Please provide any other information that you feel will be helpful in demonstrating your station's capabilities to participate in the IVS. If you proposed to the IERS in 1995/6 as a radio telescope observatory and wish to have that proposal carry over to the IVS, please make such a statement in this proposal. We wish to have the IERS proposal for Gilmore Creek as a Network Station carry over to IVS. Your signature on this form indicates your agreement to participate in the IVS as a Network Station, to comply with IVS performance standards for data quality and operational reliability, and to work closely with the IVS Network and Technology Coordinators. If this is a new proposal (i.e. not carried over from IERS) your signature commits your organization to participate in the IVS. Name of person signing: John M. Bosworth Title: Associate Chief, Laboratory for Terrestrial Physics Signature: _________________________________________ Date: _________